Hike.uno
Hike.uno
Login
Login
Username:
Password:
Login
Not registered yet? Registration.
Forgot password?
      

"This is how we have it" in Jesenice

Print
Majdag24. 11. 2025 16:00:04


Below Krvavec, drawn from the photo
by J. Medvešek...
- acrylic on canvas - 40x301
(+5)like
felix25. 11. 2025 15:54:46
I didn't know that the Jesenice municipality portal is up here too...
(+3)like
Majdag25. 11. 2025 19:28:39
Felix just for a bit of variety, drawn in Jesenice.nasmeh

Next time I'll open a new thread so other creators can join in too..nasmeh
(+4)like
Majdag29. 11. 2025 09:27:53

Jesenice News..

Improved path and new stairs on Hrušica

The Municipality of Jesenice has successfully completed two more projects in the area of the Hrušica local community as part of the 2025 participatory budget. The total value of both participatory budget proposals was 20,000 euros.
1. Replacement of stairs between blocks 71/c and 71/d

Based on the voted initiative, the municipality arranged two new staircases with railings, specifically on the path running between buildings 71/c and 71/d towards the regional road. The new arrangement replaces worn-out and dangerous stairs made of railway sleepers and provides a safer and more comfortable pedestrian connection.
2. Arrangement of the event center on Hrušica

As part of the proposal, a gravel path was improved. The contractor built about 40 meters of concrete path with stairs and railing connecting the area from Hrušica 57 towards 55/a. The new addition enables safer and more organized access to the kindergarten, the Hrušica Local Community building, and the event space.
- Jesenice news.1
(+1)like
Majdag29. 11. 2025 09:36:58
Renovation of the dilapidated water main near the court starts on December 8
We inform you that the contractor will start renovating the water supply network on the section from the entrance at the Oaza restaurant to the court building. The site induction has already been completed, and construction works will commence on December 8, 2025.
During the renovation of the hot water network, expert services found that the water main on this section of the route is heavily worn and leaking, causing major water losses. Therefore, repair is necessary. There are also some trees along the water main route that unfortunately will have to be removed due to the works.
Parking in the parking lot will be partially obstructed, and access to the area will be adjusted according to the progress of the works.
After completing the water main renovation, the contractor will also arrange the parking lot at this location.
Thank you for your understanding and patience.
- Goodbye trees.1
(+1)like
mirank29. 11. 2025 16:07:57
Felix was quite right...
(+4)like
Majdag5. 12. 2025 09:43:57
Complete road closure from the roundabout to the TVD Partizan building

Gorenjska gradbena družba, d. d., announces that due to construction works, the state road will be temporarily completely closed in both directions on the section from the roundabout at the Jesenice Administrative Unit to the TVD Partizan building. The closure will apply on Saturday and Sunday, December 6 and 7, 2025.

Start of closure: Saturday, December 6, 2025, from 6 a.m.;
end of closure: Sunday, December 7, 2025, until 6 p.m.

The closure is necessary due to road asphalt paving as part of the communal development of the OPPN Partizan area.
Detours and traffic regulation

During the closure, traffic will be rerouted via state and municipal roads:

Detour will run along the state road (Cesta Maršala Tita, R2-452/0368) and local roads: Spodnji Plavž, Kurilniška ulica, Cesta Franceta Prešerna, Skladiščna ulica, Delavska ulica and Ulica Viktorja Kejžarja.
Traffic towards Italy, Austria and Kranjska Gora will be redirected onto the municipal roads via Delavska ulica (LC 152311) and Ulica Viktorja Kejžarja (LC 152141), with one-way traffic enforced.
Traffic towards Ljubljana and Žirovnica will be directed along the parallel municipal road (roundabout – Doka, LC 152171).
- take care1
(+1)like
Majdag8. 12. 2025 15:39:45

All positive vibes here, my little hearts are just growing..nasmeh
- Kerri's hike, take care...1
(+1)like
Majdag9. 12. 2025 07:41:55
Beautiful morning through the window..nasmeh
- we're going into nature..1
(+1)like
Majdag30. 12. 2025 12:49:16
Cold but nice..nasmeh
 - Decorated with mushrooms1
- Crib under the roots2
- Whiteness speckles3
(+1)like
Jusk1. 01. 2026 01:49:10
Happy 2026🎆 I welcomed the new year on Mercinasmeh
Towards Zg. Pejcam1
Chapel of St. Barbara at Pejci2
3
Path..4
5
Cheers6
7
8
9
(+2)like
Majdag1. 01. 2026 09:17:57


New year, new hopes, new joys and sorrows, that's life- HAVE A GOOD ONE!nasmeh
- Čufarjer trg1
- High school2
-Čufarjev trg3
(+2)like
Majdag29. 01. 2026 14:13:40
Jesenice news...
Completion of the renovation of part of the Health Home in Jesenice

The Municipality of Jesenice has successfully completed the renovation of part of the Health Home in Jesenice at Cesta maršala Tita 78a. The contractor is currently furnishing the spaces with interior furniture, which is the last step before operations begin.

The first floor has modern offices and clinics, the ground floor has a multipurpose hall for seminars and lectures as well as a gym for courses and training programs. The Health Education Center Jesenice (ZVC) or the new Health Promotion Center (CKZ) will move into the renovated spaces by the end of January.
- waiting rooms1
- multi-purpose hall2
like
Majdag13. 02. 2026 08:03:30


Hruščan Carnival 2026: Gazing into the Future

On Saturday, February 14, the traditional Hruščan Carnival will take place in Hrušica, organized by the Cultural Sports Association Hrušica. This year's carnival theme will be "Gazing into the Future", so participants are invited to transform into robots, astronauts, time travelers or other figures related to the future.
- it will be fun..1
like
Majdag27. 02. 2026 11:39:10

Jesenice news...


By 2027: 113 new parking spaces

Over a period of three years, more than 100 new parking spaces will thus be created at various locations throughout the city in accordance with spatial possibilities. This represents a systemic step towards improving conditions in the area of stationary traffic and towards a higher quality of life in the city.

In addition to the mentioned projects, the Jesenice Municipality Development Strategy 2025–2035 also envisages the construction of a parking garage, which will long-term further relieve the most burdened areas and significantly contribute to the sustainable management of traffic in the municipality.
- take care..1
- it's happening...2
(+2)like
Majdag27. 03. 2026 10:13:04

Complete closure of the Jesenice – west motorway junction (Hrušica)


We inform drivers that Gorenjska gradbena družba from Kranj will carry out extensive renovation of the carriageway and two bridge structures (bridge over the Sava and overpass over the motorway) in the area of the Jesenice – west (Hrušica) junction for investor DARS.
Work schedule
The works will take place from 31 March 2026 to 18 June 2026.
Due to the nature of the works, two phases of closure will be established.
Phase 1: complete closure of the junction
In the first phase, the Jesenice – west (Hrušica) motorway junction will be fully closed to all traffic. Works will be carried out simultaneously on both bridges and the carriageway.
Planned detours:
• From direction of Ljubljana towards Kranjska Gora and Italy: diversion already at Lesce junction, then via Jesenice – east (Lipce) junction or via Karavanke plateau.
• From direction of Austria towards Kranjska Gora: diversion to Jesenice – east (Lipce) junction.
• From direction of Kranjska Gora towards Ljubljana:
o passenger vehicles: via Karavanke plateau,
o goods vehicles: through Jesenice to Jesenice – east (Lipce) junction or Lesce.
During traffic peaks, use of the Lesce motorway junction is recommended, as this relieves left turns at the signalized intersection at Slovenski Javornik and improves traffic flow

Phase 2: partial traffic release (closure of arms A and B)
After completion of works on the bridge over the Sava, arms C and D will be open to traffic.
Enabled will be:
• exit from the motorway towards Jesenice and Kranjska Gora from Ljubljana direction,
• access to Austria (Karavanke tunnel) from the parallel state road.
Detours remain as follows:
• From direction of Austria towards Kranjska Gora: diversion to Jesenice – east (Lipce) junction.
• From direction of Kranjska Gora towards Ljubljana:
o passenger vehicles: via Karavanke plateau,
o goods vehicles: through Jesenice to Jesenice – east (Lipce) junction or Lesce.
The contractor will subsequently inform about the exact date of transition from the first to the second phase.
Extensive traffic signage will be placed on the motorway and state roads. Drivers are asked to strictly follow traffic signs and detours and thus contribute to the best possible traffic flow.
- slowly1
- that's how far you get or are brought...2
(+1)like
Majdag4. 04. 2026 12:53:15


Have a nice time, for the holidays or just like that...
- behave yourselves...1
(+3)like
Majdag2. 05. 2026 13:28:23
Morning, take care..nasmeh
- Jesenice in the morning sun..1
- Mile and Dragica have taken care that there will be no more -cornices-..2
- Chapel..3
(+2)like
Majdag15. 05. 2026 19:33:01


Complete closure of the railway overpass 🚧
On Monday, May 18, 2026, from 7 to 17 hours, due to construction works, the railway overpass on local road LC 152321 will be completely closed.
The closure is necessary due to the construction of new utility lines and the rehabilitation of the roadway on the connection from Stražišar Brothers Street towards Aljaž Street and Gregorčič Street.
➡️ Detour will be arranged via Stražišar Brothers Street and Tone Tomšič Street.
🟡 On the attached sketch, the route of the detour (with a yellow line) and the changed traffic regime of the one-way street are marked.
Please comply with the temporary traffic signage and exercise caution in the construction area
- image from the web1
(+1)like
Majdag27. 05. 2026 16:06:50


Jesenice Municipality
·
🚌 𝗧𝗲𝗺𝗽𝗼𝗿𝗮𝗿𝘆 𝗰𝗹𝗼𝘀𝘂𝗿𝗲 𝗼𝗳 𝘁𝗵𝗲 𝗯𝘂𝘀 𝘀𝘁𝗼𝗽 𝗮𝘁 𝘁𝗵𝗲 𝗿𝗮𝗶𝗹𝘄𝗮𝘆 𝘀𝘁𝗮𝘁𝗶𝗼𝗻: 𝗳𝗿𝗼𝗺 𝗝𝘂𝗻𝗲 𝟭 𝘁𝗼 𝗔𝘂𝗴𝘂𝘀𝘁 𝟯𝟭 ⚠️
We have already notified about the change in traffic arrangements in the area of Jesenice railway station at the beginning of April, but as the closure start date approaches, we are highlighting the notice again.
🚧 Due to works within the Jesenice Railway Junction Upgrade project, the bus stop at the railway station will be temporarily unavailable from June 1 to August 31, 2026.
➡️ Passengers can use the nearest neighboring bus stops during this time.
- At the railway station1
(+1)like
Page:123...58596061
You must log in to post a comment:
Username:
Password:
Login
If you do not yet have a username, you must first register.
         
Copyright © 2026 Hike.uno, Terms of use, Privacy and cookies