Kocbek Hut on Korosica 1808 m

Print
garmont23. 01. 2019 13:51:54
Sadly I had to remove the pictures. zavijanje z očmi
Different interests, that's it.
Lp
(+1)like
dprapr23. 01. 2019 14:26:25
With this "homeliness" you're exaggerating a bit already.
For me "homeliness" is where there is no hut.
Otherwise this planned(?) object doesn't look bad at all.
(+3)like
piotr23. 01. 2019 14:48:38
@dprapr, where there is no hut or home, there can only be primitivity.mežikanje
(+1)like
lijaneja23. 01. 2019 15:22:36
What was wrong with the pictures that they aren't for the public?
(+1)like
GričarA23. 01. 2019 15:33:26
Who knows how long the building is even supposed to last?
like
rokb23. 01. 2019 16:06:57
There was nothing wrong with the pictures. They were actually visualizations of the conceptual design of the new hut on Korosica.
The post was just a bit awkward or premature.
Nothing is official yet and so not suitable for public posting. It could be "all talk no action" too soon.
It will be official soon and I'll make sure it's presented on your pages too.
best,rok
(+4)like
karibu23. 01. 2019 16:21:25
I'm more interested in what's with those containers at Planinska than in the new hut.
Will they be delivered to the fire site this year?
There were some plans for an emergency hut, also talk about emergency bunks...
Best regards and good luck!
(+1)like
garmont23. 01. 2019 16:31:30
They're already at the Hut. zavijanje z očmi
(+1)like
turbo23. 01. 2019 16:32:08
Here's something about the containers.

https://www.dnevnik.si/1042836261
(+3)like
rokb23. 01. 2019 16:43:05
The containers were delivered to the fire site in December.
The helicopter's carrying capacity on warm summer days at 1800m altitude is too small for the weight of an empty container, so they waited for cooler days in winter.
This spring, when conditions allow, the emergency shelter from containers will be completed.
(+5)like
karibu23. 01. 2019 16:49:03
Thanks for the info velik nasmeh
(+2)like
klemen9123. 01. 2019 18:24:33
Is the bivouac unlocked and is it possible to sleep there anytime or do you maybe need to pick up keys somewhere beforehand?
(+2)like
Loerst24. 01. 2019 07:55:11
Turbo, thanks for the article. But something isn't clear to us here. The article states that "the land is officially owned by the Church" but this one "filed a denationalization claim for the return of the nationalized property". What now, is it theirs or not, but they want it to be?

And I also don't understand how exactly building a new mountain hut would "significantly worsen the Church's position"?
(+4)like
julius24. 01. 2019 11:15:02
Hope there won't be ten pages of smart-assing again!???
PD Celje-Matica has sorted things with RKC and they are already registered owners of the parcels needed for building the hut and also the functional land.
As RKC believers say - AMEN!!!
(+10)like
rokb14. 04. 2019 01:09:50
Hello
Some time ago I promised to inform you about the progress of work on the new hut on Korosica. Again, more time has passed than I myself planned, but it must be understood that the design of the new hut on Korosica is quite a big bite for the investor Mountaineering Association Matica - Celje.
As of today, the project has literally gone public. It was presented at the assembly of the Alpine Association of Slovenia. It was the first public presentation and at the same time the first public information that the project has been approached with works on obtaining the building permit.
Let me emphasize that the basic wish of the investor Mountaineering Association Matica – Celje for the hut design is that the building will be self-sufficient, that will accept all high mountain visitors regardless of their idea of what a mountain hut should offer. It should also be ecologically neutral, meaning it won't return untreated waste to the environment.
The hut will be built at 1800 meters altitude. Just building at this height presents an exceptional engineering and logistical challenge.
It will be a self-sustaining facility. This means that it will generate electricity on site. With the help of solar panels and wind turbines. With drinking water there's more luck. 200 meters from the hut is a natural spring for which Mountaineering Association Matica – Celje has obtained water rights for use.
The design of the new hut is primarily based on the desire to utilize the location and design for solar energy use. Above the floor plan of the old hut it breaks and with its design enables solar energy use throughout the day. At the same time, right at this break, it represents a permanent reminder of the old hut that burned down.
The old hut will be represented in the floor identical to the old floor plan dimensions, which will extend across the terrace into the dining room interior. The floor will continue into the wall with the fireplace and this very wall will form the boundary between the sleeping and living area of the hut.


1
2
3
4
5
6
7
8
9
10
11
12
13
(+16)like
Bandzo14. 04. 2019 06:39:54
Excellent!
like
panda14. 04. 2019 07:57:52
About the placement plan? You didn't write anything. zmeden
(+1)like
garmont14. 04. 2019 08:19:34
Nice, Rok.
I'm glad you found a common language. nasmeh
(+2)like
rokb14. 04. 2019 10:34:43
Construction plan.
It is necessary to understand that really nice weather at 1800 meters is rare. Half the year is taken by winter. The other half of the year is mostly changeable and really nice only two-three months. The construction speed will be accordingly quite slow compared to building in the valley.

The object design is such that most elements will be prepared in the valley. On site mainly assembly. Nevertheless, we plan to speak of two to three years before the new hut opens its doors to all visitors.

For this year 2019, the production of project documentation and obtaining the building permit is planned. If everything goes according to plan, works on the removal of the old object and preparation of foundations for the new hut will start this year.

In 2020: erection of the structure and completion of the external shell (closure) of the object.

In 2021: complete the works on installations and finalization.

In 2022, it is planned to complete the works on equipment and final finalization. If all goes according to plan, the opening is planned in this year.
(+8)like
Page:123...89101112